Solar Ac Air Conditioner With Panels And Battery

KF-50GWS 18000 BTU solar air conditioner, on grid hybrid wall split, PV DC input plus grid AC, indoor head and outdoor condenser, PV panels and battery pack in the set, flare line set, remote control
Send Inquiry
Description
KF-50GWS  /  18,000 BTU  /  panels and battery  /  on grid hybrid
The Crate Is The Product: An 18,000 BTU Solar Split Is Bought In Four Parts
Ask what an 18,000 BTU solar air conditioner costs and the honest answer needs four numbers: the head and condenser, the panels that feed them, the battery that carries the night, and the controller that keeps the three from arguing. This page walks through all four, in the order a quotation is actually built.
Model KF-50GWS  ·  18,000 BTU nominal  ·  about 5.3 kW cooling class  ·  PV plus grid  ·  wall split with array and battery
18,000
BTU NOMINAL
about 5.3 kW cooling
4
ITEMS IN A SET
head, condenser, array, bank
2
POWER PATHS
photovoltaic DC and grid AC
1
CONTROLLER
one point where all cables meet

The KF-50GWS is an 18,000 BTU wall split with a hybrid power stage: photovoltaic DC in, grid AC in, and a compressor that does not care which one is live. On a datasheet that is one line. In a project it is four purchases, and the customer who buys only the first one ends up with a solar air conditioner that runs on the grid all summer.

This page is written for the buyer who has to put the whole set in front of a committee: what is inside the carton, what has to be bought beside it, how the array and the bank are sized against an 18,000 BTU load, and which of the numbers can only be fixed once the site is known. Where a value depends on the build, it is marked that way rather than guessed.

KF-50GWS indoor head over a battery cabinet with the condenser outside and panels above
PACKAGE 01

Four parts, and only one of them is an air conditioner

A solar split is a set. The head and the condenser are the part everyone recognises, and they are also the cheapest part of a working system. The array sets how much of the cooling the roof pays for; the bank sets how much of the evening it covers; the controller is the only place where the three cables meet, and it is the part most often undersized.

Treat them as one purchase and the numbers line up. Treat them as four purchases and the system is assembled by whoever answers the phone first - a panel set sized for a fridge, a controller sized for the panel set, and an air conditioner sized for nothing in particular.

That is why the quotation for this model is a bill of materials rather than a price for a box. The head is fixed at 18,000 BTU; everything else is agreed against the site.

Nominal capacity 18,000 BTU. Reference conversion: 18,000 BTU/h is about 5.3 kW of cooling.
PACKAGE 02

Why 18,000 BTU is the size where the package starts to matter

At 9,000 or 12,000 BTU a single head can be carried by a small array and the grid does the rest of the work, so the package is almost an afterthought. At 18,000 BTU the balance shifts: the unit is big enough to cool a shop floor or an open living area, and big enough that the daily energy figure starts to dominate the quotation.

Put another way, the head is roughly one and a half times the load of a 12,000 BTU unit, but the array does not grow by one and a half - it grows by the number of hours the room is occupied. A shop open ten hours a day needs a materially different roof to a bedroom used at night.

Practical consequence: on this size, ask for the daily cooling hours before the price. The unit is the same; the package behind it is not.

KF-50GWS wall head and outdoor condenser on a light background
Cooling capacity is fixed on this model. Array count, battery capacity and controller rating are set against the site and confirmed at quotation.
KF-50GWS outdoor condenser, single fan and service cover
PACKAGE 03

The condenser does the work the brochure never mentions

The outdoor unit is a single-fan condenser with the service cover on the right cheek and two flare valves for the line set. Behind that cover sits the power section, where the DC feed from the array and the AC feed from the grid arrive. On a hybrid set this is the part that has to survive the worst of both worlds: a 40 degree afternoon on the coil and a grid that may dip when the compressor starts.

Installation space is not a detail. A condenser boxed into a recess re-circuits its own hot air, head pressure climbs, current rises and capacity falls exactly when the room needs it most. The clearances in the installation guide are a minimum, not a suggestion.

The nameplate on this unit is the binding document for refrigerant type and charge, rated current and operating limits. Those values follow the build, so they are confirmed with the order rather than printed into a web page.

Two flare connections, one service cover, one nameplate. The nameplate wins over any general figure.
PACKAGE 04

The array: pairs, tilt and the reason one shaded panel ruins the afternoon

Panels are wired in pairs on this platform. The two positives are brought together at a distribution header, the two negatives likewise, and the groups are then paralleled. That topology keeps the array voltage within the controller window without a long series string, which matters when the roof is small and the cable run is short.

Tilt is adjusted at the bracket, and the useful setting is usually steeper than the roof pitch, because the load peaks in the middle of the day rather than across the whole year. Every panel in a group must see the sun: one panel shaded by a tank or a parapet drags its partner down, and the system quietly leans on the grid from two in the afternoon.

Panel count is not fixed by the model. It follows the daily energy figure from PACKAGE 02, which follows the room and the hours of use.

KF-50GWS set shown with two photovoltaic panels
Array size, tilt and mounting hardware are quoted per site. The unit accepts a photovoltaic DC input; it does not ship with a fixed panel count.
KF-50GWS set with three photovoltaic panels against open sky
PACKAGE 05

The battery is a decision about hours, not about amp hours

Buyers ask for a battery in kilowatt hours, which is the wrong unit for the question they are actually asking. What a battery buys is hours of cooling after sunset; the kilowatt hour figure only means something once the running current and the hours are known.

In a hybrid set the bank also has an easier job than in an off-grid set. It is not asked to carry a whole overcast week; it is asked to cover the evening, and to ride through short interruptions. That is why a moderate bank is often enough on this platform, and why a very large one is usually a sign that the site should have been off-grid instead.

Chemistry, capacity and enclosure are confirmed with the order. What the page can state is the rule: size the bank for the night hours you want, not for the size of the air conditioner.

Battery capacity, chemistry and housing are order-specific and quoted with the set. Depth of discharge limits come from the battery supplier, not from us.
PACKAGE 06

One controller, three cables, two breakers

Everything electrical meets at the controller: the array on one side, the battery on another, the DC feed to the air conditioner on the third. Three sets of conductors on the same block is where installation errors are usually born, so the guide is explicit - a 40 A DC breaker between battery and controller, a second 40 A breaker between controller and array, and two 4 mm² cables from controller to battery cabinet.

Both breakers exist so a technician can isolate a section without working live. Label the cables at both ends; the next person to open the cabinet will thank you, and if there is ever a warranty conversation, the labels are what makes it short.

The AC side is ordinary single-phase work: dedicated circuit, isolator within sight of the condenser, earth at the unit. Where the grid is unstable, a stabiliser is worth discussing before the set ships rather than after the first trip.

Close view of the KF-50GWS condenser fan guard
Breaker ratings and cable sizes above follow the installation guide supplied with the set. Final protection must satisfy the local electrical code.

PACKAGE 07
How the set is sized against a working day

Three packages, one head. The difference between them is not the air conditioner - it is how much of the day and night the roof is asked to cover. The table is the logic we use in a quotation, written out so it can be checked.

Package What is supplied What the roof covers Suits Relative cost

A. Roof offsets the day

Head, condenser, array, controller Grid covers mornings and evenings; the array carries the middle of the day Stable grid, daytime occupancy, lowest capital

Lowest

B. Roof plus an evening bank

Adds a moderate battery and its breaker Two to four hours after sunset on the bank, then the grid Shops that trade into the evening, areas with short outages

Moderate

C. Roof plus a night bank

Adds a bank sized for overnight running Cooling continues until morning without the grid Long or frequent outages, off-grid sites, diesel replacement

Highest

Hour figures are the design intent, not a guarantee: they move with ambient temperature, room load, battery condition and how often the door opens. The quotation states the assumptions used for the site.

KF-50GWS head installed on a wall with panels and condenser below
PACKAGE 08

The order of work, and what happens if it is broken

A set this size is installed over one to two days, and the order of work is fixed because each stage depends on the one before it. The plate has to be level before the head is hung; the vacuum has to be pulled before any valve is opened; the array should be live before the first cooling test, or the test proves nothing about the hybrid stage.

The table below is the spine of the installation guide that ships with the set, with the reason each step sits where it does. Contractors who follow it do not usually come back, and the ones who skip the evacuation are the ones who blame the unit in the first heatwave.

# Step Why it sits here

01

Mount the wall plate

Four expansion screws on a level line. A plate out of level shows up later as a head that will not sit flush.

02

Flare and connect

Two copper nuts and the drain outlet at the back of the head. Caps come off only when the joint is about to be made.

03

Drain and wiring

Drain tube fitted, cable lifted in the same direction, both leaving through one sleeve.

04

Wrap and hang

Line set, cable and drain taped together, passed through the wall, head hung on the plate.

05

Panel frame and array

Brackets set to the chosen tilt, pairs wired positive to positive and negative to negative, groups paralleled at the header.

06

Controller and battery

Breakers fitted on both DC legs, 4 mm² cables to the battery cabinet, all three cable sets landed and labelled.

07

Evacuate and open

Gauge on the large valve, pump on the gauge, about ten minutes of vacuum, then valves opened with an Allen key.

08

Leak test and first run

Soap solution on every joint, then a first start from the handset to confirm cooling and check for noise.

Source: installation guide supplied with every set. Step order follows the guide.

PACKAGE 09

Commissioning: ten minutes of vacuum is a floor, not a target

Most first-week complaints on a split set are not faults. They are commissioning leftovers: a system with air in the lines, a drain running uphill, a condenser in a corner that cannot breathe, or an array shaded at the hour the load peaks.

If the gauge does not hold after the pump is isolated, there is a leak and more pumping will not fix it. Soap solution on every flare finds the joint that was tightened by hand faster than any detector, and it costs nothing.

Record three numbers at handover: room temperature, set point, and minutes to reach it. Six months later that line is what separates a real fault from a hot week.

Technicians assembling and checking Juka solar air conditioners
Commissioning steps are listed in the installation guide; the readings belong in the handover document, not on a brochure.
Check What good looks like

Vacuum and hold

Reach the stated vacuum, isolate the pump, watch the gauge for drift.

Leak test

Soap solution on every flare and valve cap; re-check after an hour of running.

Drain flow

Pour water into the tray and confirm it leaves the wall, not the room.

Air path

Clear space in front of the fan and behind the coil; check for recirculation.

DC side

Both breakers closed, all three cable sets labelled, terminals checked for tightness.

First run

Start from the handset, confirm cooling, listen for fan rub or compressor noise.
KF-50GWS outdoor units on a pallet being prepared for shipment
PACKAGE 10

Packing, weight and the container conversation

The head ships in its own carton with foam and a bag; the condenser ships upright with capped valves and its feet fitted. Neither is heavy for two people, but the carton is the part that gets damaged on a stairwell, so it stays packed until it is at the wall.

Panels and batteries are usually quoted on a separate pallet because they are heavier and pack differently. Mixing them into one container is normal and we do it regularly; what matters is the loading plan, so the panels go in first and the air conditioners do not sit on top of a battery.

Unit weight, carton dimensions and container loading are confirmed on the order confirmation. They vary with the condenser size and the battery option, so a single figure here would be wrong for most destinations.

Carton size, net and gross weight, and units per container are stated on the order confirmation.
PACKAGE 11

Spares, service and the second season

A split is serviced by local technicians, so the parts that wear have to be ordinary parts: filters, fan motors, capacitors, control boards and handsets. The wiring layout is common across the range, which shortens a service call because the technician already knows where the terminals are.

On the DC side, the annual visit should cover three things at once: battery terminals, controller connections and the condition of the panel frames. Doing them together is what keeps a solar set alive past its second season in a dusty market.

Service parts lists and lead times are quoted with the order. For distributors, configuration, packaging and documentation are held per customer so a repeat container matches the first.

Production line for Juka solar air conditioners
Spare parts availability is confirmed per order. Ask for the service parts list with the quotation.
Sunlit room cooled by a KF-50GWS head with panels outside
PACKAGE 12

What the room gets, in the end

Strip away the array, the bank and the controller and what is left is a wall head that cools a large room quietly, with a handset on the table and a drain that goes outside. That is the part the customer lives with; everything else lives on the roof or in a cabinet.

As a planning figure, an 18,000 BTU head is asked to cool roughly forty to sixty square metres, and the width of that range is the point: insulation, ceiling height, glazing and occupancy move the requirement by more than one model size does.

Oversizing is not free on a solar set either. A unit that cycles too much dehumidifies poorly and pulls its starting current more often, and the array that feeds it has to be larger than the room actually needs.

Room area figures are industry guidance, not a comfort guarantee. A heat load estimate for the actual room is the reliable basis.
PACKAGE 13

The head itself: what is on the wall

A steel back plate on four expansion screws, two flare connections and a condensate outlet behind the casing, an adjustable louvre across the front and a display window with the set point. The filter lifts out from the top for cleaning.

Two decisions are made at this stage rather than at the condenser. Height above the floor decides whether the air reaches across the room or falls on the sofa; the fall of the drain decides whether condensate leaves the building or the wall.

The head is the same casting across the platform, so a technician who has opened one unit has opened all of them - which is worth more than a millimetre of styling on a service visit three years from now.

KF-50GWS indoor head, louvre closed
KF-50GWS head and condenser supplied with two panels
PACKAGE 14

Before the quotation: seven numbers we need

An enquiry with these seven answers can be quoted the same day. Without them the quotation is a guess, and the container is a risk - usually discovered when the wrong voltage or the wrong plug arrives.

Everything on the list changes something physical: the power stage, the panel count, the battery enclosure, the flare size, the documentation language, the carton print.

Lead time and container loading are quoted per order. Mixed containers with other models are accepted.
Information Why we ask for it

Destination country and port

Voltage, plug type, documentation language, certification expectation.

Room size, height, glazing

Whether 18,000 BTU is the right size at all.

Daily cooling hours

The daily energy figure that sets the array.

Roof or terrace area

Panel count and tilt, or a recommendation.

Battery: none, evening or night

Which of the three packages applies.

Line set length

Pipe length and flare size for the interconnecting set.

Single or split shipment

Whether panels and battery ship with the units.

SIZE LADDER
Where 18,000 BTU sits in the range

Three sizes share this platform, so the choice is usually between them rather than against other brands. The capacity class is fixed; the package around it is what has to be sized.

Model Capacity class Typical room Array implication Notes

KF-35GWS

12,000 BTU / about 3.5 kW Bedroom, small office, single room Smallest daily energy of the three Entry point; grid carries most of the night

KF-50GWS

18,000 BTU / about 5.3 kW Open living area, shop floor, small restaurant Roughly half again the daily energy of the 12,000 The size where a battery starts to pay for itself

KF-70GWS

24,000 BTU / about 7.0 kW Hall, workshop, large retail space Largest array requirement of the three Off-grid and 48 V DC variants exist on this size

Power figures are reference conversions of the nominal BTU rating. Array implication is a planning statement, not a panel count.

FIELD NOTES
Five mistakes we see on hybrid sets

None of these are product faults, and all of them are avoidable before the container is booked.

# What happens Why it costs money

01

Array sized to the unit, not to the hours

A roof sized against the BTU number alone under-produces in a ten-hour shop and over-produces in a bedroom used at night.

02

Battery bought before the load is known

Capacity in kilowatt hours means nothing until the running current and the hours are fixed.

03

Condenser boxed into a recess

Recirculated hot air raises head pressure and cuts capacity in the afternoon, which reads as a weak unit.

04

Vacuum treated as a formality

Moisture left in the circuit shows up as poor cooling in week one and compressor damage in season two.

05

DC cables unlabelled

Three cable sets on one controller block; unlabelled cables turn a service call into an afternoon of tracing.

QUESTIONS
What buyers ask about a package with panels and a battery

Does the price include the panels and the battery?

The set is quoted as a package: head, condenser, array, battery and controller. Because the array and the bank are sized per site, the package is priced from the site numbers rather than from a list price for the box.

Can I buy the air conditioner now and add the array later?

Yes, and it is a common route. The unit runs on the grid on its own; the array and the bank can be added when the budget allows. Keep the space, the cable route and the breaker positions planned from the start.

What actually happens after sunset?

With a bank, the set continues on the battery until its design depth of discharge is reached; then it returns to the grid. Without a bank, the compressor stops with the sun and the room is on the grid or on nothing.

How many hours will the battery run the unit?

Work it out in three steps: running current from the nameplate, hours you want, and the usable capacity of the bank after its depth-of-discharge limit. We do that arithmetic with your numbers and put the assumptions in the quotation.

What if the grid is already unreliable?

Then the bank is doing more work than in a stable market, and the package is closer to configuration C. The unit itself is unchanged; the battery and the protection around it are sized for the outage pattern.

I already have panels on the roof. Can they be used?

Usually, if the array voltage window and the controller rating suit this unit. Send the panel model, the string layout and the controller, and the input can be checked before the order rather than after.

Is 18,000 BTU right for a shop?

It suits roughly forty to sixty square metres of insulated space. A glass front, a tin roof and a door that opens all day will exceed that, and two smaller heads usually beat one unit running flat out.

How does it ship?

The head and the condenser ship in their own cartons; panels and battery travel on separate pallets. Mixed containers with other models from the range are normal, and the loading plan is agreed with the order.

SPECIFICATION
KF-50GWS at a glance

Fixed values are stated. Values that follow the build are marked, because a set that includes panels and a battery is configured per site rather than picked from a shelf.

Parameter KF-50GWS

Model

KF-50GWS

Product type

Wall-mounted split air conditioner with photovoltaic and grid inputs

Nominal cooling capacity

18,000 BTU/h (about 5.3 kW cooling class)

Set composition

Indoor head, outdoor condenser, PV array, battery and controller as quoted

Indoor unit

Wall head, adjustable louvre, washable filter, display window

Outdoor unit

Single-fan condenser, louvred service cover, two flare valves

Control

Handset remote supplied with each set

Power architecture

PV DC input plus grid AC input, hybrid operation

Refrigerant

Type and charge printed on the unit nameplate; set with the build

Rated current and power input

Per build; stated on the nameplate and the order confirmation

Operating limits

Per build; see nameplate and installation guide

Dimensions and weight

Head, condenser, panels and battery; confirmed on the order confirmation

Packing

Foam and bag packed cartons; panels and battery on their own pallets

Line set

Two flare connections, liquid and suction; length agreed per installation

Electrical protection

Dedicated AC circuit and isolator; 40 A DC breakers on both array and battery legs

Certification

CE for the electrical arrangement; documents travel with the order

Branding

JUKA as standard; private label available

Why some rows say "set with the build": the cooling capacity of this model is fixed at 18,000 BTU, but refrigerant, line set, array size and battery capacity are chosen against the destination and the site. The nameplate on the unit and the order confirmation are the binding documents; this table is the shape of the offer, not a substitute for them.

THE FACTORY

Built in Hangzhou, where the panel and the compressor are specified together

Hangzhou Juka Solar started in 2015 with a single question: what if the photovoltaic side of a cooling product were designed by the same people who design the cooling side? The range has grown since - chest freezers, refrigerators, ice makers, mobile carts, and now split air conditioners - but the rule has not changed: the array, the controller and the appliance are quoted as one system, because a bag of parts is what an importer can already buy anywhere.

Partners in Ghana, Gabon, Cameroon, Nigeria, Kazakhstan and India have taken the further step of assembling locally, with our drawings and our test sheets. For an air conditioner that matters at the moment the unit is commissioned, not at the moment it is sold.

2015
FOUNDED IN HANGZHOU
2 + 17
INVENTION AND UTILITY MODEL PATENTS
CE
ELECTRICAL ARRANGEMENT CERTIFIED

What the test bench catches

Stage What it protects

Evacuation before charge

Air and moisture in a circuit cool badly in the first week and destroy a compressor in the first season. Every set is evacuated, not purged.

Charge by weight

Refrigerant is weighed at the station. Fifty grams short is invisible on a mild day and obvious at forty degrees, and the unit takes the blame.

Run-in on both sources

A hybrid unit is not proven on grid alone. Units are run long enough for the compressor to start cleanly and the fan to run without rub.

QC separate from production

Only units signed off by an inspector are packed. The two functions do not report to the same line manager.

Documents with the shipment

CE covers the electrical arrangement of the equipment; utility model patents cover the cabinet and the direct-drive control layout. Documents are packed with the order so they can be presented at customs or to a tender committee without a second request.

CE - low voltage and EMC

CE - low voltage and EMC

CE - supplementary schedule

CE - supplementary schedule

Utility model patent

Utility model patent

On the floor

Assembly area Assembly station

OEM, ODM and local assembly

Private label, SKD and CKD supply are available on this platform, together with technical support for partners who assemble locally rather than import finished units.

✓  Customer logo, cabinet colour and handset artwork

✓  Voltage, plug type and documentation language

✓  Packaging design and carton print

✓  Unit on its own, or the full package with array and bank

✓  Mixed containers with other models from the range

Hot Tags: solar ac air conditioner with panels and battery, China solar ac air conditioner with panels and battery manufacturers, suppliers, factory